04 / 05: ABOUT

To be the partner Indonesian engineers and plant operators call when it needs to be fast, honest, and right the first time.


COMMITMENT

We answer inside business hours, in plain terms, with the technical reasoning behind the answer.

In practice it means three things. We answer every inquiry within the hour. The answer is a confirmation, a no, or a technically equivalent alternative. When the exact specification is not available, we work out what is.


EXPERIENCE BEHIND ALP

Procurement experience across Indonesia's power, oil & gas, and LNG projects

The team behind ALP has spent more than fifteen years in procurement on some of Indonesia's most demanding engineering and industrial projects. Several of these projects have been inaugurated or visited on site by sitting Presidents of the Republic of Indonesia and successive Ministers of Energy and Mineral Resources. ALP exists to put that experience on the buyer's side of the table.

SELECTED PROJECTS

Manyar Industrial Complex

Three parallel projects within one of the most significant industrial developments in East Java: the Manyar Desalination Project, supplying the smelter's process and utility water; the Manyar Smelter Project, one of the world's largest single-line copper smelters with concentrate throughput of 1.7 million tonnes per year; and the Freeport Manyar Refinery, the precious metal refining facility inaugurated by the President of Indonesia in 2025.

Complexity

A national-scale project on a recovery timeline. We mobilized senior EPC procurement people from across the industry to staff three parallel workstreams at once.

We coordinated procurement and services across all three projects, with procurement value under direct responsibility of up to USD 1.5 billion and ten to fifteen purchase orders a week at peak. The complex was toured on site by the President of Indonesia in 2023. During the visit, the procurement team met directly with the Minister of Energy and Mineral Resources, who conveyed that the recovery was to be treated as a national priority.

Categories procured
MECHANICAL EQUIPMENT DESALINATION PACKAGES SMELTER & REFINERY EQUIPMENT ELECTRICAL INSTRUMENTATION PIPING VALVES FITTINGS CIVIL MATERIALS CHEMICALS SERVICES MANPOWER
Sourced from
INDONESIA CHINA GERMANY USA FINLAND SWEDEN JAPAN CANADA SINGAPORE

Tanjung Jati B Units 5 and 6

Complexity

We carried field procurement through the worst of Indonesia's COVID-19 site restrictions, with most of the workforce demobilized and global shipping in disarray.

Site-based procurement coordination for the addition of two 1,000 MW ultra-supercritical units, bringing total plant capacity to 4,640 MW under a twenty-five-year power purchase agreement. We cleared short shipments, damaged goods, and wrong deliveries in high volume through peak construction, prepared commissioning manpower subcontracts to Indonesian labour law, and handled customs for imported equipment arriving at port. The Minister of Energy and Mineral Resources led the groundbreaking.

Categories procured
CONSUMABLES SMALL TOOLS SPARE PARTS SITE SERVICES MANPOWER CIVIL MATERIALS REPLACEMENT EQUIPMENT CUSTOMS & BROKERAGE
Sourced from
INDONESIA CHINA JAPAN USA

Central Java Power Plant (PLTU Batang)

Complexity

Closeout of the project's procurement, picking up decisions made by people who had already left, reading the contracts inherited from them, and negotiating liquidated damages with vendors after Commercial Operation Date.

Post-Commercial Operation Date procurement closeout, warranty, and retention release on a 2x1,000 MW ultra-supercritical coal plant supplying PLN under a twenty-five-year power purchase agreement. The project is on public record as Indonesia's first public-private-partnership project in electricity infrastructure, guaranteed by the Ministry of Finance and the Indonesia Infrastructure Guarantee Fund. The President of Indonesia kicked off construction at the Presidential Palace. The plant went on to record an average availability factor of 85.21 percent and 11.3 TWh in a single year.

Categories procured
SPARE PARTS WARRANTY REPLACEMENT EQUIPMENT SPECIALIST SERVICES TOOLS CONSUMABLES LUBRICANTS MANPOWER
Sourced from
INDONESIA CHINA MALAYSIA THAILAND

Batangas Combined Cycle Power Plant

Complexity

Equipment packages bought at the worst point of the pandemic, when shipping and international travel had both broken down, for a facility with no precedent in the country.

We were procurement representative on the largest combined cycle power plant ever built in the Philippines, a 1,278 MW Ilijan plant combined with a new 1,313 MW combined cycle facility. Scope covered drafting the RFQ terms and conditions, issuing the inquiries, chasing bids, clarifying, and negotiating across twenty-four packages. The new facility went into commercial supply under a long-term power supply agreement.

Categories procured
MECHANICAL EQUIPMENT GAS TURBINE AUXILIARIES BALANCE OF PLANT ELECTRICAL INSTRUMENTATION CONTROL SYSTEMS PIPING VALVES FITTINGS CIVIL & STRUCTURAL MATERIALS
Sourced from
PHILIPPINES USA EUROPE CHINA

Lontar Extension Unit 4

Complexity

We negotiated a contract breach worth about USD 600,000 directly, while a new unit went up alongside three that were already running.

We procured the equipment and commodity packages for a 315 MW supercritical unit added to the existing Lontar plant, which supplies DKI Jakarta, Banten, and the surrounding area. PLN picked it as a pilot under its 35,000 MW programme, and the President of Indonesia led the groundbreaking in person. Indonesian local content (TKDN) requirements applied throughout. The project recognised us as Best Performance Procurement Representative.

Categories procured
MECHANICAL EQUIPMENT BOILER AUXILIARIES ELECTRICAL INSTRUMENTATION CONTROL SYSTEMS PIPING VALVES FITTINGS CIVIL & STRUCTURAL MATERIALS COAL HANDLING EQUIPMENT SERVICES SUBCONTRACTS HEAVY EQUIPMENT
Sourced from
USA EUROPE CHINA INDONESIA THAILAND

Banyu Urip Central Processing Facility

Complexity

Electrical and instrumentation procurement on a sour-crude onshore facility, with hazardous-area certified equipment (ATEX, IECEx) and engineering specifications that arrived incomplete, so we went back to suppliers again and again to clarify.

We were the procurement engineer for the electrical and instrumentation packages on the central processing facility of an oil field that today supplies more than a quarter of Indonesia's crude production. The facility took production above 130,000 barrels per day on commissioning, and a later extension of the same field was inaugurated virtually by a successor President of Indonesia. We delivered the packages to the client's documentation standard under a consortium-led engineering, procurement, and construction contract worth about USD 746 million.

Categories procured
HV & MV SWITCHGEAR TRANSFORMERS MOTORS CABLES DCS & PLC SYSTEMS FIELD INSTRUMENTS FIRE & GAS DETECTION UPS & BATTERY SYSTEMS LIGHTING SPECIALIST SERVICES
Sourced from
INDONESIA EUROPE USA CHINA

Senoro Gas Development Project

Complexity

A high-H2S sour gas environment, which meant specialist material certifications, vendors in eleven countries, and long-cycle expediting out to a remote island site, all against a hard handover deadline.

We were the procurement engineer for the electrical and instrumentation packages on a central processing plant that produces 310 MMSCFD of sales gas across two trains: fourteen gas wells, a 23 km onshore pipeline, jetty, gas and steam turbine generation, nitrogen plant, hot oil system, H2S removal, dehydration, and custody transfer metering. At the time it was the second-largest gas infrastructure project in Indonesia, with an EPC consortium value of about USD 520 million. It reached 43.78 percent local content against a 40.41 percent target and took IPMA Awards bronze for best project excellence. The President of Indonesia inaugurated it on site as part of an integrated mega-project with USD 5.8 billion in combined investment.

Categories procured
GAS TURBINE GENERATOR AUXILIARIES STEAM TURBINE GENERATOR AUXILIARIES HV & MV SWITCHGEAR TRANSFORMERS MOTORS CABLES DCS ESD FIRE & GAS SYSTEMS H2S-RESISTANT FIELD INSTRUMENTS CUSTODY TRANSFER METERING UPS & BATTERY SYSTEMS
Sourced from
USA UK GERMANY ITALY FRANCE SWEDEN CHINA KOREA JAPAN SINGAPORE INDIA INDONESIA
SELECTED PROPOSALS

Tangguh LNG Expansion, Train 3

Complexity

Proposal-stage electrical and instrumentation scope for an LNG plant: hazardous-area electricals, cryogenic instrumentation, and getting principal vendors to commit to a Papua site three thousand kilometres from Jakarta.

We were the procurement engineer on the FEED and EPC bid for the expansion of what is today Indonesia's largest gas producer, contributing about a third of national gas production. The consortium won the bid and signed the onshore EPC contract at about USD 2.43 billion. The President of Indonesia inaugurated Train 3 on site, the first time a sitting president had visited Tangguh, with the Minister of Energy and Mineral Resources, the Minister of Investment, the Minister of State Secretary, and the Chairman of SKK Migas alongside him.

Categories priced
EX-RATED ELECTRICALS CRYOGENIC INSTRUMENTATION MV MOTORS LARGE TRANSFORMERS DCS & SIS FIRE & GAS DETECTION TELECOMMUNICATIONS
Sourced from
MULTI-COUNTRY SUPPLY EUROPE NORTH AMERICA ASIA

ACROSS THE PORTFOLIO

We handled about USD 30 million, saved USD 3 million, and sourced from sixteen countries.

Those projects drew material and equipment from sixteen countries across North America, Europe, and Asia. The disciplines they needed are the ones we bring to every inquiry now.

MASTER LIST PREPARATION CONTRACT BREACH NEGOTIATION LIQUIDATED DAMAGES POST-AWARD EXPEDITING INVOICING & CLOSEOUT INCOTERMS INDONESIA CUSTOMS & EXCISE TKDN ADMINISTRATION

THE COMPANY
Legal entity
PT. Artha Leksana Purnama
Established
January 2026
Office
Tebet, Jakarta Selatan
Pipeline
Origin → Indonesia → Site
05: CONTACT

Send the specification.
We will tell you what we can do with it.

RESPONSE WINDOW
We acknowledge inquiries within the hour, Mon–Fri 09:00–18:00 WIB.
DIRECT
+62 811-1010-3222
[email protected]